Date
|
Category
|
Explain
|
August 1, 1968
|
Founding stage
|
Founding
|
August 1, 1968
|
Principal handover
|
Founding president (Pan Yi Yanjiao Chang 57/08/01 to 69/07/31 years)
|
February 1, 1969,
|
Important buildings
|
More than half of the first buildings in the construction of the new school building, except for the doors and windows are not with bracket unopened but could not bear any Yonghe lower grade elementary students, "four" system class reasons, the school Fangnai Yi contingent moved back to new schools opening on the third floor construction, second floor classes, but the teaching stopped working hard to teachers and students spirits schoolwork examine progress in the month. Then look at the second and third buildings and a reading room, specialist classrooms craft factory sequential completion of walls, bridges, Chuantang road after another was completed.
|
During the 69 years on August 1
|
Principal handover
|
Second president (LIANG Xi principals 69/08/01 to 76/07/31, seven)
|
During the 69 years on August 2
|
Major events
|
69 academic year, day and night students has increased to the one hundred twenty-six classes, the number of teachers and students has reached 63 600 people, to become one of the province's large country. Existing class has exceeded our load to create a separate school district in our original the Fuhe woman junior school has also been the academic year beginning of a school year, reducing freshman enrollment shifts.
|
In 1987, on August 1
|
Principal handover
|
The third president (President Li Ping shade of 76/08/01 to 80/07/31 for four years)
|
August 1, 1991
|
Principal handover
|
Fourth president (Wang Zhendong principals 80/08/01 to 84/07/31 for four years)
|
August 1, 1991
|
Important buildings
|
Construction of the Matilda floor.
|
August 1, 82
|
Major events
|
Began to enroll girls
|
August 1, 1995
|
Principal handover
|
Fifth president (Zhengming Yong principals 84/08/1 87/07/31 three years, 87 years redesignated to Shihting High School)
|
August 1, 1995
|
Important buildings
|
Matilda House, to enable the construction of the letter Wing House.
|
August 1, 1998
|
Principal handover
|
Sixth president (Ye Jinxiong principals 87/08/01 to 93/07/31 06)
|
August 1, 1998
|
Important buildings
|
Letter chant Floor enabled.
|
January 1, 2000
|
Important buildings
|
Actively planning the reconstruction of the old school buildings: such as peace building (September 2000), and self-building a
|
January 1, 2001
|
Important buildings
|
Playground and corridors, and other projects have been completed and opened to construct a high-quality educational environment to create a warm teaching garden.
|
December 1, 2003
|
Important buildings
|
Self-Reliance Building, Phase II completed and opened to construct a high-quality educational environment, create a warm teaching garden.
|
January 1, 2004
|
Important buildings
|
Completion of the performing arts? Set up, aluminum windows update, planning to exercise Museum curtains, toilet renovation, the school gate to set LED schools news network.
|
August 1, 2004
|
Principal handover
|
Seventh president (Houquan Li principals 93/08/01 to present)
|
January, 2005
|
Major events
|
Completion of the whole school video playback system, two additional computer classrooms, teachers' information center class convention center, the year completely eliminated from the administrative computer, formally retired faculty "Park" in the 11/11 anniversary enabled.
|
January, 2006
|
Major events
|
The permeable brick channel, construction of additional motorcycle parking shed.
|
November 7, 2008
|
Major events
|
School 40th anniversary celebration.
|
December, 2011
|
Principal handover
|
Substitute principal (He Wenqing principals (2011.12.2 to 2012.7.31)
|
January, 2012
|
Major events
|
Classroom to install computers and projectors.
|
August , 2012
|
Principal handover
|
Eighth president (Chen Yu Fen principal 2012.8.1 to now)
|
September, 2012
|
Important buildings
|
Playground reconstruction.
|
March, 2014
|
Major events
|
The Explore library opening.
|
March, 2016
|
Major events
|
Ninth grade classrooms set up air conditioning equipment.
|
December, 2017
|
Important buildings
|
Wall reconstruction project.
|
|
|
|
|