History

Date

Category

Explain

August 1, 1968

Founding stage

Founding

August 1, 1968

Principal handover

Founding president (Pan Yi Yanjiao Chang 57/08/01 to 69/07/31 years)

February 1, 1969,

Important buildings

More than half of the first buildings in the construction of the new school building, except for the doors and windows are not with bracket unopened but could not bear any Yonghe lower grade elementary students, "four" system class reasons, the school Fangnai Yi contingent moved back to new schools opening on the third floor construction, second floor classes, but the teaching stopped working hard to teachers and students spirits schoolwork examine progress in the month. Then look at the second and third buildings and a reading room, specialist classrooms craft factory sequential completion of walls, bridges, Chuantang road after another was completed.

During the 69 years on August 1

Principal handover

Second president (LIANG Xi principals 69/08/01 to 76/07/31, seven)

During the 69 years on August 2

Major events

69 academic year, day and night students has increased to the one hundred twenty-six classes, the number of teachers and students has reached 63 600 people, to become one of the province's large country. Existing class has exceeded our load to create a separate school district in our original the Fuhe woman junior school has also been the academic year beginning of a school year, reducing freshman enrollment shifts.

In 1987, on August 1

Principal handover

The third president (President Li Ping shade of 76/08/01 to 80/07/31 for four years)

August 1, 1991

Principal handover

Fourth president (Wang Zhendong principals 80/08/01 to 84/07/31 for four years)

August 1, 1991

Important buildings

Construction of the Matilda floor.

August 1, 82

Major events

Began to enroll girls

August 1, 1995

Principal handover

Fifth president (Zhengming Yong principals 84/08/1 87/07/31 three years, 87 years redesignated to Shihting High School)

August 1, 1995

Important buildings

Matilda House, to enable the construction of the letter Wing House.

August 1, 1998

Principal handover

Sixth president (Ye Jinxiong principals 87/08/01 to 93/07/31 06)

August 1, 1998

Important buildings

Letter chant Floor enabled.

January 1, 2000

Important buildings

Actively planning the reconstruction of the old school buildings: such as peace building (September 2000), and self-building a

January 1, 2001

Important buildings

Playground and corridors, and other projects have been completed and opened to construct a high-quality educational environment to create a warm teaching garden.

December 1, 2003

Important buildings

Self-Reliance Building, Phase II completed and opened to construct a high-quality educational environment, create a warm teaching garden.

January 1, 2004

Important buildings

Completion of the performing arts? Set up, aluminum windows update, planning to exercise Museum curtains, toilet renovation, the school gate to set LED schools news network.

August 1, 2004

Principal handover

Seventh president (Houquan Li principals 93/08/01 to present)

January, 2005

Major events

Completion of the whole school video playback system, two additional computer classrooms, teachers' information center class convention center, the year completely eliminated from the administrative computer, formally retired faculty "Park" in the 11/11 anniversary enabled.

January, 2006

Major events

The permeable brick channel, construction of additional motorcycle parking shed.

November 7, 2008

Major events

School 40th anniversary celebration.

December, 2011

Principal handover

Substitute principal (He Wenqing principals (2011.12.2 to 2012.7.31)

January,  2012

Major events

Classroom to install computers and projectors.

August , 2012

Principal handover

Eighth president (Chen Yu Fen principal 2012.8.1 to now)

September, 2012

Important buildings

Playground reconstruction.

March, 2014

Major events

The Explore library opening.

March, 2016

Major events

Ninth grade classrooms set up  air conditioning equipment.

December, 2017

Important buildings

Wall reconstruction project.

 